TN0009 • SONARtrac - Pre-installation Work On-site to be Performed by Client
Pre-installation Work On-site to be Performed by Client
Description:
This document describes in general the work that should be performed by client prior to arrival by CiDRA for flowmeter installation, and the work to be performed by CiDRA during installation. For best efficiency and to minimize installation cost, it is recommended that the client complete the pre-installation work noted below in section A before the arrival of CiDRA on-site for the installation.