Dialog window

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

Dialog window

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • News
  • Careers
  • Solutions
    • P29 Technology
    • SONARtrac
    • CYCLONEtrac PST
  • Resource Center
    • P29 White Paper
    • Tech Support Request
    • Resource Center
  • Contact Us
Select Page

SONARtrac – Rework of Connector and Base to Add Guide Pins and Bushings

by Thomas Vaichus | Jul 10, 2023

SONARtrac® – Rework of Connector and Base to Add Guide Pins and Bushings There has been an instance of the P/N 20814 Connector Assembly becoming disengaged from the P/N 20812 Base Assembly. These are used to connect the sensor head to transmitter cable to the...

SONARtrac – Procedure for Fiberglass Cover Strike and Latch Replacement

by Thomas Vaichus | Jul 10, 2023

SONARtrac® – Procedure for Fiberglass Cover Strike and Latch Replacement The purpose of this document is to provide instructions for replacement of the latches and strikes used to attach the fiberglass sensor head cover halves.

SONARtrac – Procedure for Removal of Sensor Head

by Thomas Vaichus | Jul 10, 2023

SONARtrac® – Procedure for Removal of Sensor Head The purpose of this document is to establish a procedure for the removal of the sensor head. The sensor head should be re-installed per the Installation Manual.

SONARtrac – Procedure for Replacing Sensor Cover Connector Base Assembly

by Thomas Vaichus | Jul 10, 2023

SONARtrac® – Procedure for Replacing Sensor Cover Connector Base AssemblyThe purpose of this document is to establish a procedure for the replacement of the sensor cover connector base assembly.

SONARtrac – Procedure for Replacing SST Cover Flange Gaskets

by Thomas Vaichus | Jun 28, 2023

SONARtrac®SONARtrac – Procedure for Replacing SST Cover Flange Gaskets The purpose of this document is to establish a procedure for the replacement of the stainless steel cover flange gaskets.
« Older Entries
Next Entries »

Recent Posts

  • Weir and CiDRA Announce Strategic Investment and Global Collaboration Agreement
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • Mike Davis
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer

Recent Comments

    • About Us
    • Contact Us
    • We Are CiDRA
    • Tech Support Request
    • Careers

    CiDRA Minerals Processing Inc - HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing Inc
    Enhanced Recovery
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200

    ©2026 Copyright CiDRA Minerals Processing Inc. All rights reserved. Privacy Policy
    • Facebook
    • X