×

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • News
  • Careers
  • Solutions
    • P29 Technology
    • SONARtrac
    • CYCLONEtrac PST
  • Resource Center
    • P29 White Paper
    • Tech Support Request
    • Resource Center
  • Contact Us
Select Page

SONARtrac – Procedimiento para Reemplazar los Sellos de las Cubiertas de Fibra de Vidrio

by Thomas Vaichus | Jul 11, 2023

SONARtrac® – Procedimiento para Reemplazar los Sellos de las Cubiertas de Fibra de Vidrio El objetivo de este documento es establecer un procedimiento para el reemplazo de los sellos de las cubiertas de fibra de vidrio del SONARtracTM. Lea el procedimiento...

CYCLONEtrac PST – Declaración de Conformidad de la UE

by Thomas Vaichus | Jun 26, 2023

CYCLONEtrac PST – Declaración de Conformidad de la UE

CYCLONEtrac OSM – Declaración de Conformidad de la UE

by Thomas Vaichus | Jun 26, 2023

CYCLONEtrac – Declaración de Conformidad de la UE

SONARtrac – Declaración de Conformidad de la UE

by Thomas Vaichus | Jun 26, 2023

SONARtrac – Declaración de Conformidad de la UE

Request for Application Data Short Form – Spanish

by Thomas Vaichus | Jun 20, 2023

Solicitud de Datos de Aplicación – Información para Instalación y Cotización Request for Application Data Short Form – Spanish
« Older Entries
Next Entries »

Recent Posts

  • Weir and CiDRA Announce Strategic Investment and Global Collaboration Agreement
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • Mike Davis
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer

Recent Comments

    • About Us
    • Contact Us
    • We Are CiDRA
    • Tech Support Request
    • Careers

    CiDRA Minerals Processing Inc - HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing Inc
    Enhanced Recovery
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200

    ©2025 Copyright CiDRA Minerals Processing Inc. All rights reserved.
    • Facebook
    • X