Dialog window

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

Dialog window

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • News
  • Careers
  • Solutions
    • P29 Technology
    • SONARtrac
    • CYCLONEtrac PST
  • Resource Center
    • P29 White Paper
    • Tech Support Request
    • Resource Center
  • Contact Us
Select Page

Sonar, el Poder de la Tecnología Pasiva en el Sector del Procesamiento Mineral • Rocas y Minerales October 2017

by Aimee Hernandez | Feb 28, 2024

<h1>Sonar, el Poder de la Tecnología Pasiva en el Sector del Procesamiento Mineral</h1>

Siguiendo la Corriente – Mining Magazine April 2010

by Aimee Hernandez | Feb 28, 2024

<h1>Siguiendo la Corriente – Mining Magazine April 2010</h1>

Faenas Mineras Utilizan – Nuevos Medidores de Flujo

by Aimee Hernandez | Feb 28, 2024

<h1>Faenas Mineras Utilizan – Nuevos Medidores de Flujo</h1>

Sistema de Monitoreo de Ciclones Mejora la Operación en la Concentradora Copperton de KUC – E&MJ December 2011

by Aimee Hernandez | Feb 28, 2024

<h1>Sistema de Monitoreo de Ciclones Mejora la Operación en la Concentradora Copperton de KUC – E&MJ Decemeber 2011</h1>  

TIAR Participa en FlUIMIN December 2010

by Aimee Hernandez | Feb 28, 2024

<h1>TIAR Participa en FlUIMIN December 2010</h1>  
« Older Entries
Next Entries »

Recent Posts

  • Weir and CiDRA Announce Strategic Investment and Global Collaboration Agreement
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • Mike Davis
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer

Recent Comments

    • About Us
    • Contact Us
    • We Are CiDRA
    • Tech Support Request
    • Careers

    CiDRA Minerals Processing Inc - HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing Inc
    Enhanced Recovery
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200

    ©2026 Copyright CiDRA Minerals Processing Inc. All rights reserved. Privacy Policy
    • Facebook
    • X