×

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • News
  • Careers
  • Solutions
    • P29 Technology
    • SONARtrac
    • CYCLONEtrac PST
  • Resource Center
    • P29 White Paper
    • Tech Support Request
    • Resource Center
  • Contact Us
Select Page

2016 Automining • Real-Time Individual Cyclone Particle Size Tracking

by Aimee Hernandez | Feb 22, 2024

<h1>Survey of Real-Time Individual Cyclone Particle Size Tracking (PST) In Multiple Concentrators</h1> Proper grind control has been limited by the inability to track the particle sizes in the overflow in real-time and on an individual cyclone basis....

2016 Procemin • Survey of Real-Time Individual Cyclone Particle Size Tracking

by Aimee Hernandez | Feb 22, 2024

<h1>Multiple Concentrator Survey of Real-Time Individual Cyclone Particle Size Tracking (PST)</h1> Proper grind control has been limited by the inability to track the particle sizes in the overflow in real-time and on an individual cyclone basis....

2016 WODCON • New Technology for Dredging Mixture Velocity Measurement

by Aimee Hernandez | Feb 22, 2024

<h1>New Technology for Dredging Mixture Velocity Measurement</h1> Passive sonar based mixture velocity measurement was evaluated on a DEME trailing suction hopper dredger. A conventional electro-magnetic flow meter served as the velocity reference....

2016 MINExcellence • The Value of Real-Time Particle Size Tracking on Individual Cyclones

by Aimee Hernandez | Feb 22, 2024

<h1>2016 MINExcellence – The Value of Real-Time Particle Size Tracking on Individual Cyclones</h1> Since large pumps became available in the 1950’s with enough capacity to create rotary motion required for cyclone classification, the cyclone has held...

2015 Procemin • Real-Time Particle Size Tracking in Individual Hydrocyclones

by Aimee Hernandez | Feb 22, 2024

<h1>Real-Time Particle Size Tracking in Individual Hydrocyclones: New Field Results</h1> The presence of unwanted coarse material in flotation feed streams has negative impacts on both recovery and throughput of concentrator plants. Detection of this...
« Older Entries
Next Entries »

Recent Posts

  • Weir and CiDRA Announce Strategic Investment and Global Collaboration Agreement
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • Mike Davis
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer

Recent Comments

    • About Us
    • Contact Us
    • We Are CiDRA
    • Tech Support Request
    • Careers

    CiDRA Minerals Processing Inc - HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing Inc
    Enhanced Recovery
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200

    ©2025 Copyright CiDRA Minerals Processing Inc. All rights reserved.
    • Facebook
    • X