×

P29 Technology • Case Study

For more information please email Paul Rothman or Mark Holdsworth. Thank you.

×

Resource Optimization

Bridging the Critical Supply Deficit in Copper

CiDRA’s novel technology gives a mine a new set of financial and production levers that unlocks throughput and recovery performance with their existing installed plant assets, delivering a new operating point and increasing the value of the mineral resource. This technology provides a low cost solution to ‘turbo-charge’ the performance of the existing plant delivering a boost in productivity for existing resources that enables the industry to meet the copper supply deficit.

CiDRA Minerals Processing
  • About Us
  • News
  • Careers
  • Solutions
    • P29 Technology
    • SONARtrac
    • CYCLONEtrac PST
  • Resource Center
    • P29 White Paper
    • Tech Support Request
    • Resource Center
  • Contact Us
Select Page

2014 IMPC • Rating Cumulative Grade Recovery Curve Data

by Aimee Hernandez | Feb 22, 2024

<h1>Rating Cumulative Grade Recovery Curve Data</h1> Evaluation of inequalities of the partial sums defining cumulative grade and recovery prove that cumulative grade has an upper bound not dependent on the bank number and cumulative recovery possesses an...

2014 IMPC 2014 • Process Optimization Using Real-Time Measurement

by Aimee Hernandez | Feb 22, 2024

<h1>Process optimization at Rio Tinto Kennecott using real-time measurement of coarse material in individual hydrocyclone overflow streams</h1> The presence of unwanted coarse material in flotation feed streams negatively impacts both recovery and...

2014 MAPLA • Low Maintenance, Real-Time Tracking of Particle Size

by Aimee Hernandez | Feb 22, 2024

<h1>Low maintenance, real-time tracking of particle size in individual hydrocyclones for process optimization</h1> The purpose of a mineral comminution circuit with a ball mill running in closed-loop with a hydrocyclone classification battery is to feed...

2014 WIM • Efficiency of Pumps in Parallel Operation

by Aimee Hernandez | Feb 22, 2024

<h1>Efficiency of Pumps in Parallel Operation on Long-Distance Water Pipelines</h1> Mining operations in the high mountains increasingly rely on water being pumped up from sea level for their process needs. Future process plants may be able to use sea...

2005 January • Accurate Liquid Phase Density on Aerated Liquids

by Aimee Hernandez | Feb 22, 2024

<h1>Accurate Liquid Phase Density on Aerated Liquids</h1> Density is one of the most widely used composition-based measurements in industrial process control. However, it is well recognized that the presence of small, but unknown levels of entrained gases...
« Older Entries
Next Entries »

Recent Posts

  • Weir and CiDRA Announce Strategic Investment and Global Collaboration Agreement
  • CiDRA Minerals Processing Inc. Showcases Revolutionary Technology at MINEXCHANGE 2024 SME Annual Conference & Expo
  • Mike Davis
  • CiDRA Awarded a Services Contract for First of a Kind Grind Circuit Rougher at OZ Minerals’ Carrapateena Mine Site
  • Senior Process Engineer

Recent Comments

    • About Us
    • Contact Us
    • We Are CiDRA
    • Tech Support Request
    • Careers

    CiDRA Minerals Processing Inc - HQ
    50 Barnes Park North
    Wallingford, CT 06492
    +1.203.265.0035

    CiDRA Minerals Processing Inc
    Enhanced Recovery
    427 Hayden Station Road
    Windsor, CT 06095
    +1.860.602.8200

    ©2025 Copyright CiDRA Minerals Processing Inc. All rights reserved.
    • Facebook
    • X